ترانسفورماتور توزیع سه فاز روغن غوطه ور شده با نصب روی پد 2500 کیلو ولت آمپر، 34.5 کیلو ولت، استانداردهای ANSI IEEE

ترانسفورماتور سه فاز نصب شده
July 01, 2025
مختصر: Discover the 2500 kVA Pad Mounted Three-Phase Oil-Immersed Distribution Transformer, designed to meet ANSI IEEE Standards. Ideal for outdoor use, this transformer integrates core, windings, and high-voltage load switches in a sealed enclosure. Perfect for loop and radial feed applications, it ensures reliable power distribution with high efficiency and safety.
ویژگی های مرتبط محصول:
  • Capacity range from 75 kVA to 5500 kVA, suitable for various power needs.
  • Primary voltage options include 34.5KV, 24.94KV, 13.8KV, and more.
  • Secondary voltage options like 480Y/277V and 208Y/120V for versatile applications.
  • Complies with IEEE/ANSI, CSA, IEC, DOE 2016, and NEMA standards.
  • UL/cUL certified with options for partner authorization.
  • Compact, fully sealed design ensures safety and reduces installation space.
  • Features copper windings and natural ester insulating fluid for eco-friendliness.
  • Includes surge arrestors and overcurrent protection for enhanced safety.
متداول:
  • What is the lead time for the 2500 kVA Pad Mounted Transformer?
    The mass production lead time is typically 15-25 days, with quick delivery options available.
  • Does the transformer come with a warranty?
    Yes, it comes with a 24-month warranty from the B/L date, including free service for accessory problems and technical support.
  • Can the transformer be customized to specific requirements?
    Yes, OEM/ODM services are available, including customized colors, functions, logos, and design modifications based on customer needs.
ویدیو های مرتبط

ترانسفورماتور نوع روغن

ترانسفورماتور توزیع غوطه ور
October 16, 2024

ترانسفورماتور نصب شده پد تک فاز

ترانسفورماتور تک فاز نصب شده بر روی پد
August 22, 2024

ترانسفورماتور نصب شده قطب

ترانسفورماتور نصب شده بر قطب
August 22, 2024

ترانسفورماتور قدرت سه فاز رزین اپوکسی خشک

ترانسفورماتور رزین ریخته گری
August 22, 2024

ترانسفورماتور کنترل

ترانسفورماتور کنترل
July 15, 2024